Newmarket Motors installed the Airius system to address unbalanced temperatures in their Cork showroom. Conditions were too hot on the first floor and too cold on ground floor. Following installation this problem was eliminated, with the added benefit that the workload from the AC system was highly reduced.

Newmarket Motors installed the Airius destratification system into their Cork showroom, Ireland through their licensed contractor ‘Electrical Mechanical Controls Ltd’.

They needed to resolve the uncomfortably high temperatures experienced on their first floor and the uncomfortably low temperatures found on their ground floor, which were creating unwelcoming conditions for customers and was unsuitable for their staff to work in.

The Airius destratification system was simple and quick to install and not only resolved the temperature imbalance, but also highly reduced the output, workload and operating times required from the A/C system offering significant savings on their energy costs.

Download the full case study for Newmarket Motors

Key Points:

  • 12°C heating reduction.
  • A/C settings reset from ‘high’ to ‘low
  • Heating reduced by approx. 24 hours per week
  • Solved temperature inconsistencies

newmarket

Graph

“We (Electrical Mechanical Controls Ltd – Ireland) surveyed the VW Showroom as the owner had expressed that he was having problems with uneven temperatures between the upstairs offices and downstairs offices and showroom. Staff upstairs were too hot and the staff downstairs were working with their coats on at times. The Showroom has 3 sides of glass, floor to roof. They have 4 combined heating/cooling units with the temperature set between 30 – 33°C, with 4 blowers set to maximum. We installed 3 Airius Model 25’s and we are awaiting the electricity bills to show definite reductions.

In the meantime, the temperature on the A/C units have been reset at between 18 – 22°C with the 4 blowers on the low setting and 2 of these are turned off intermittently for approx. 2 – 4 hours per day.

Staff on both floors commented on the lovely comfortable temperature in comparison to before the system was fitted.

Sean Browne – Director – Newmarket Motors

-->